Dear Sir, is switch tamper. Plasser Tamping units 4 pct tamping tools/unit or 8 total tamping tools - move sideways
For this machine is available as a paid option (see Option Box):
+ Additional option: change from 08 to 16 tamping to
Additional option: change from 08 to 16 tamping units tools (in the
likeness units Unimat 08-275 3S Switch Tamper)
Тhe 16 tamping units tools in the likeness units Unimat 08-275 3S Switch
Tamper.
Example video unit 3S 16 tamping tools:
http://www.youtube.com/watch?v=rrEPSiyFBrs
Dear Sir,You are a customer outside Europe.
The serial number and present location of machine for urgent inspection
will be provided once you sign a contract Assignment, and pay deposit.
Negotiations to conclude a contract with a visit to accept a tentative
schedule in REM representative office in Sofia:
http://www.remtechstroy.org/en/contacts/s
Dear Sir,t
The procedure is as follows {Company outside Europe}:
For purchase at:
REBUILT 2005 year Universal-Stopfmaschinen Plasser (1000 mm)
http://www.tampers.org/Stopfmaschine-08-16SP-1984-SKU178552.html
PHASE I: Purchase of railway equipment from a seller in the platform
{www.tamper.eu};
1) Conclusion of assignment contract between REM and Company buyer {Name} for the purchase
of railway equipment - EXW EU (Bulgaria): XXXXXX euro;
2)Depositing of the fee / deposit to REM;
3) Perform technical inspection of the equipment in place before
purchasing by
Company buyer {Name}.
View and visit are put down in the protocol signed by the
(official REM person- seller, buyer - Company buyer {Name}. The
protocol is a part of the
contracts referred to in paragraph 1).
5) Confirm the purchase of the equipment by Company buyer {Name};
6) Bank payment of the amount due from Company buyer {Name}
Ltd to the seller;
In case that Company buyer {Name} declines to purchase the
railway equipment, REM will
release deposited fee / deposit amounting to 80% to Company buyer {Name} Ltd within one month from the date of the inspection in the
protocol.
PHASE II: Buying a complete technically serviced and / or upgraded
railway machine
with warranty included:
>>> II. Additional option: change from 1000 to 1065mm mm Broad Gauge Track:
>>> 150000-155000 euro
1) Signing a contract between REM and Company buyer {Name}
for full technical maintenance and
Additional option: change from 1000 to 1065mm mm Broad Gauge Track with
warranty
service in Europe;
warranty service outside of Europe (not included in the price);
2)Transportation of the railway equipment to REM Repair Depot;
3) Payment of 50% in advance according to the signed contract for
technical
maintenance or Additional option: change from 1000 to 1065mm mm Broad
Gauge Track;
4) Perform repair and modernization of changing the Broad Gauge
Track from 1000 mm
to 1065 mm.
6) Technical inspection of railway equipment after maintenance,
repair and
changing the Broad Gauge Track from 1000 mm
to 1065 mm by the contractor;
7) Payment of the remaining amount due on the contract - 40%;
8) Transportation of railway equipment to port BG EU (not
calculated in the price);
9) Transportation of railway equipment to country by the owner
(not calculated in the price);
10) Putting into operation of railway equipment in the presence of
REM engineer (not calculated in the price);
11) Signing a Protocol for commissioning;
12) Payment of the remaining 10% under contract and warranty start
from REM in
Europe or etc.
I must point out that the railway equipment at the time (Broad
Gauge Track 1000 mm)
is not serviced technically or upgraded as required in Phase II.